NTPC
NTPC

NTPC Placement Paper

Company: NTPC

NTPC Placement Paper 22 April 2007 (Delhi)

Paper Type : Candidate Experiences
Test Date : 22 April 2007
Test Location : Delhi

NTPC PAPER ON 22nd APRIL AT DELHI

HELLO frns

I am giving u the paper minutes of NTPC exam on april 22 ,2007 b’cz I have faced the problem of non availability of any pattern or sample questions .It was really an easy paper so the cut off marks r really high. It constitutes of 170 questions (120 tech + 50 apti) in 2hrs.

For tech part the syllabus is same as of the GATE and for apti part R.S.Aggarwal is more than sufficient. As time duration is very short so time management is very important

APTITUDE SECTION

For this section no special attention is required only rs aggarwal is enough and it also has easy level of English section

TECHNICAL SECTION

For this section u have to b good in the basics. No hard question were asked but u should b careful about your time . It has also some part of very basic general knowledge. The questions were from following topics
14-15 ques on thermodynamics
8-9 ques on dynamics of machines
5-6 ques on machine desine
10-11 ques on turbines
7-8 ques on heat transfer
5-6 ques on operation research & management
8-9 ques on fluid mechanics & machines

thanks
Regards,
Manoj kumar meena

NTPC Placement Paper

About NTPC

NTPC is India’s largest energy conglomerate with roots planted way back in 1975 to accelerate power development in India. Since then it has established itself as the dominant power major with presence in the entire value chain of the power generation business. From fossil fuels it has forayed into generating electricity via hydro, nuclear and renewable energy sources. This foray will play a major role in lowering its carbon footprint by reducing green house gas emissions. To strengthen its core business, the corporation has diversified into the fields of consultancy, power trading, training of power professionals, rural electrification, ash utilisation and coal mining as well.

NTPC became a Maharatna company in May 2010. As of January 2020, there are 10 Maharatnas CPSEs in India. NTPC is ranked No. 2 Independent Power Producer(IPP) in Platts Top 250 Global Energy Company rankings. visit offical Website of NTPC for more details

Read More