NTPC
NTPC

NTPC Placement Paper

Company: NTPC

NTPC Placement Paper 9 April 2006

Paper Type : Candidates Experiences
Test Date : 9 April 2006

NTPC PAPER – 09 APR 2006

I wrote the NTPC exam held on april 9th,2006(Electronics Stream)
I faced the problem of “knowing the syllabus and the pattern” of it before
the exam.I was not able to find the correct guidance in any of these grps.So
i thought I would share mine so that it would be useful for the future
aspirants of NTPC.

First 120 question on technical and 50 questions on general aptitude.
1/3 negative marks for all the questions.
2 hours exam.(No calculator allowed)
Question paper along with the key sheet should be handed over to the
invigilator after the end of exam.

About the Technical:
questions about diac,triac,buck effect etc.
Control systems,synchros,all basics and theoretical
computer NETWORKS: (abt CSMA/CD,bridges,routers,Ieee standards like 802.3,etc.(abt ethernet))
VLSI (CMOS structure, functioning,)
DIGITAL ELECTRONICS
(gates,negative logic,postive logic,nand,counters,etc.)
Sample question:write a particular number in BCD,or hex equivalent etc.)
cominational circuit design(no of gates required etc.)
electronics:
led bias,tunnel diode bias,fet,bjt,feedback amplifier
properties,optoelectronic devices,class c amplifiers,multivibrators,band gaps
in Si,Ge.,intrinsic concentration etc.
general:

abt ozone layer depletion (CFCs)
The total efficeincy of a thermal plant.
communications:
Amplitude modulation,FM Vs. AM.
Antennas :
Director,reflector in yagi uda,microwave frequency ranges,bands,
ground wave,sky wave,space wave propagation.In which media em waves travel
faster.
Microprocessor 8085,interrupt structure,architecture,memories,mapping
schemes,8255,interrupt controller(8259)(ICW1,OCW etc.)
hard disk,floppy disk access times
mangement science
abc analysis(inventory management)
signals systems:
fourier transfor,sinc functions,convolution
network theory:
resonant frequency formulae
OP AMPS:
a/d d/a converters,differentiators and integrators,instrumentation
amplifiers.
digital communications:
fdm, tdm
I almost covered 95% of the topics.This is as far as I could remember.
About aptitude:
synonyms
antonyms
comprehension passages
aptitude problem solving skills(train probs,loss profit sums,ratios,etc.)
word analogies
fill in the sentences with the most suitable word type of questions.

Tips:Time management is very important.Since most of the technical questions
are theoretical,complete them quickly and do well in the aptitude section.
Individual cut off in each of the 2 sections is necessary.
i don’t know the actual cut off though.

(Paper Submitted By : Krishna)

NTPC Placement Paper

About NTPC

NTPC is India’s largest energy conglomerate with roots planted way back in 1975 to accelerate power development in India. Since then it has established itself as the dominant power major with presence in the entire value chain of the power generation business. From fossil fuels it has forayed into generating electricity via hydro, nuclear and renewable energy sources. This foray will play a major role in lowering its carbon footprint by reducing green house gas emissions. To strengthen its core business, the corporation has diversified into the fields of consultancy, power trading, training of power professionals, rural electrification, ash utilisation and coal mining as well.

NTPC became a Maharatna company in May 2010. As of January 2020, there are 10 Maharatnas CPSEs in India. NTPC is ranked No. 2 Independent Power Producer(IPP) in Platts Top 250 Global Energy Company rankings. visit offical Website of NTPC for more details

Read More